As you may be aware from the recent announcement in the local newspapers
by Luke Donnellan MP (State Member for Narre Warren North), Timbarra
Secondary College will finally become a reality.
The Timbarra 7-9 campus will become part of Timbarra PS thus
becoming Timbarra P-9 College.
Timbarra 7-9 project details as follows:
Creation of a new campus to cater for years 7 to 9 on the existing
Timbarra PS site and adjoining College green field site.
Development of two learning communities each with a variety of
learning spaces for a P –
9 school in addition to the existing primary school facilities
The new 7 – 9 component will
include:
Upgrade of and refurbishment of the existing Primary School
administration area to cater for additional staff and administrative
tasks commensurate for a P – 9 school. This will entail redevelopment of
existing library/resource space being converted to administrative use.
Construction of a new Resource/Library centre to cater for P – 9
The construction of two purpose designed flexible learning spaces that
will cater for years 7 – 9 with a variety of learning areas including
seminar spaces, project areas, multi disciplinary creative studios, IT
facilities, display areas, student amenities, staff areas and associated
support facilities. These new facilities will bring together design,
art, science and technology and general learning areas.
In addition there will be a combined indoor sporting facility comprising
three basketball courts. The DEECD is funding one of the courts with the
funding for the remaining two to be provided by the City of Casey.
This facility will also contain home economics, music and drama
spaces together with student amenities and a canteen.
Additional staff car parking and landscaping including two new outside
basket ball hard-court areas |
|
Frequently asked QUESTIONS and answers
Information Evening
Meeting for Timbarra P-9 College
Monday 15th
June at 7pm.
1.
Road access through Belldale is blocked, not allowing through road to
City of
2.
Parking – will there be more and wider spaces?
Parking is already congested just with the Primary School.
In the Master Plan
you will see additional Parking has been provided for staff as with Q1 though
traffic management will be coordinated by the City of
3.
When will the P-9 College be running?
Year 7 will
commence in 2011, Year 8 2012, Year 9 2013
4.
I
have a daughter starting high school 2010 and another 2011. If I start 2010 and
school opens 2011 will I be able to bring my daughter back from Berwick
secondary to new school to join sister starting in 2011?
As in the previous
question, the school will begin with a year 7 enrolment in 2011, there will be
no year 8 until 2012 so your eldest daughter will be that one year too early
5.
If we live on Timbarra Estate or Bellbird Park Estate do our children have to go
to
No - You will have
priority for
6.
What happens when they reach Year 10 – where are they meant to go?
Berwick Secondary won’t be able to accommodate their own Year 9 &
Timbarra Year 9 when they both need to go into year 10.
Parents and
students will be able to choose from a variety of Secondary Colleges dependent
upon programs the best meet students’ needs – however if the endorsed
neighbourhood boundary is still in place in 2013, enrolment in Berwick SC and
Kambrya College will be restricted. At year 10 students who attend Timbarra SC
who live in the Berwick neighbourhood boundary will be able to enrol in year 10
at Berwick SC.
7.
Is there going to be a full size oval?
Will it have lights? Will there be clubroom facilities?
No. Not provided
by DEECD. But in the future this may be considered
8.
Are there plans to continue the school to Yr 12, if not where will students
complete their schooling?
There are no plans
to continue the school to Year 12
9.
Staffing – what will the structure be? Catchment area?
The staffing
for the school is set by DEECD through the schools enrolment numbers. The
structure will be determined by the principal of the school to provide the best
educational outcomes within the restrictions of the school budget.
The school will
have no “endorsed neighbourhood boundary” when it opens
10.
Will the whole school be ready for the start of the 2010 school year?
The school will be
built in two stages Stage 1 will be completed for Year 7 to commence in 2011,
Year 8 2012, Year 9 2013
11.
Will the Primary school children be able to use the drama and PE facilities?
All students from
Prep to Year 9 will have full access to all facilities including the Drama and
PE facilities The school timetabling of the schools facilities will be
determined by the principal in consultation with the staff.